
Service
Flat Roof Cost per m² (2026)
Straight per-m² prices for a new flat roof in 2026: felt from £75/m², GRP fibreglass £110/m², EPDM rubber £95/m² — all installed, all including new deck if needed and edge trims. Minimum job £1,400.

- Felt (3-layer torch-on): £75–£95/m²
- GRP fibreglass: £100–£130/m²
- EPDM rubber: £90–£115/m²
- New 18mm OSB deck: +£22/m²
- Edge trims, drips & upstands included
- Minimum job £1,400 (mobilisation + waste)
What the per-m² number actually includes
Our quoted rate covers strip-off of the old covering, disposal, new deck if needed (usually needed on anything over 15 years old), the primary membrane, edge trim, upstand detail to abutting walls and a written 15–25 year guarantee. It excludes access equipment above 3m, structural repairs to joists, and rooflight replacement.
Which membrane suits which roof
Small porches and bay canopies — felt or EPDM. Extensions with foot traffic (occasional access) — GRP. Big warm-roof extensions with insulation upgrade — EPDM (single sheet, no seams up to 15m). Anything with a rooflight cluster — GRP moulds around detail better.
- ▸Porch (2–4m²) — felt or EPDM, £600–£1,400
- ▸Bay canopy (2–3m²) — GRP or lead, £550–£1,200
- ▸Small extension (10–15m²) — GRP or EPDM, £1,500–£2,400
- ▸Large extension (25–40m²) — EPDM, £2,800–£4,600
Why cheap quotes come back to bite
A £45/m² 'bargain' felt roof usually means single-layer felt on the existing damp deck, no edge trims, and battens instead of new drip. It lasts 3–5 years. Doing it once properly at £85/m² lasts 20+ and you don't repaint the extension ceiling every winter.
FAQs
Is Building Regs approval needed?+
For a like-for-like replacement, no. For a warm-roof upgrade (adding insulation above the deck) or a change from cold to warm roof construction, yes — Part L applies.
Can I have a walk-on flat roof?+
Yes — GRP with a walk-on topcoat, or EPDM with pavers on pedestals over a protection board. Adds £30–£60/m².
How long does the job take?+
20m² extension: 2 days. 40m²: 3–4 days. Weather-dependent — EPDM can't go down in heavy rain, GRP needs 2 dry days for the resin to cure.
Related reading
Other pages homeowners usually look at alongside this one.
Need Roofing Work You Can Rely On?
Speak with Butler Bespoke Roofing for honest advice, a free site visit and a clear, written quote anywhere across Buckinghamshire.
